Skip to main content
BIBIANA

BIBIANA

 Construction work in BIBIANA.

From 13/08/2024 to 30/09/2024, construction work will take place on the ground floor of BIBIANA. The BIBIANA team wants to provide visitors with a more comfortable space, including a barrier-free toilet.

It is likely that the mentioned works will increase the noise level somewhat. However, the work space will be separated by a plastic screen in the corridor behind the elevator.

The premises of the dressing room, cash desk, toilet will be accessible.

 

Pages